Search
Close this search box.

Green Pin® DNV Master Link Assembly

The Green Pin® DNV Master Link Assembly is tailored for offshore operations. This assembly, certified by DNV, boasts a generous opening to cater to larger lifting points. Additionally, its protective coating guarantees enduring durability, even in harsh environmental conditions. Available in various options, the DNV Master Link Assembly offers a working load limit ranging from 4.1 to 100 tons.

 

Key features:

  • Spacious opening designed to accommodate larger lifting points
  • Specifically suited for offshore applications with DNV certification
  • Protective coating ensures prolonged durability
  • Exceptional stock availability of 99%