The Green Pin® DNV Master Link Assembly is tailored for offshore operations. This assembly, certified by DNV, boasts a generous opening to cater to larger lifting points. Additionally, its protective coating guarantees enduring durability, even in harsh environmental conditions. Available in various options, the DNV Master Link Assembly offers a working load limit ranging from 4.1 to 100 tons.
Key features:
Copyright © 2024 Mines Services Suriname N.V., All Rights Reserved.
Made with ❤ by Technovate